Preparing Your Site for a Cabin Delivery
A little preparation makes cabin delivery quick and safe. Here's what to sort before our HIAB arrives.
Ground and position
Choose a firm, reasonably level spot for the cabin. Jack-leg cabins can be levelled on their adjustable legs, but the ground should be stable enough to take the weight.
Access
Our HIAB-lorry needs room to get in, set up and lift. Let us know about narrow entrances, low branches, overhead cables or soft ground so we can plan the lift — a quick survey helps on tricky sites.
Connections
Decide where power, water and drainage will connect. Getting these ready in advance means your cabin is usable as soon as it's placed. Tell us your access details when you order and we'll advise.